Solar Panels in Fareham

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 3 miles from Fareham in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Fareham

Your information is secure and will never be shared.

Solar in Fareham: the local details

Fareham is a borough of houses more than flats. At the 2021 Census more than a third of its homes were detached and nearly another third semi-detached, with terraced houses under a fifth and flats about one in nine.

The council describes the borough as mainly urban, made up of several sizeable settlements close to one another: Fareham itself, Portchester, Stubbington and Hill Head, Titchfield, and the Western Wards of Locks Heath, Park Gate, Sarisbury, Titchfield Common and Warsash. A detached or semi-detached house usually has more than one roof slope to work with, so the survey is mostly about picking the best of them and checking what shades it.

Fareham Borough Council

Fareham Borough Council is the planning authority for the whole borough, from Portchester in the east to Warsash and Sarisbury in the west. Most houses can have roof panels as permitted development, with no planning application, if the panels stand no more than 0.2 metres off the roof slope and no higher than the highest part of the roof.

The council has 13 conservation areas: Cams Hall, Catisfield, Fareham High Street, Hook, Osborn Road, Portchester (Castle Street), Sarisbury Green, Swanwick Shore, Titchfield, Titchfield Abbey, Town Quay, Wallington and Warsash. Each has its own page on the council’s website with a character assessment and a plan of its boundary.

The council says work that needs no planning permission is more restricted inside a conservation area and asks people planning any work there to contact it first. Under the national rules, panels on a wall facing a highway need planning permission in a conservation area and panels on a flat roof need prior approval. A listed building needs listed building consent.

Scottish and Southern Electricity Networks (SSEN)

The network operator for Fareham is SSEN. Solar systems of 3.68kW or less per phase connect under G98: the system is fitted, and your installer sends SSEN the G98 form within 28 days of commissioning.

A system above 3.68kW per phase, up to 50kW, needs a G99 application to SSEN before it is installed. SSEN says its quotation can take up to 45 working days from the date it receives the correct information.

If SSEN finds the local network cannot take everything a larger system would export, an export limitation scheme, which caps the power sent to the grid, may cost less and connect sooner than paying for the network to be reinforced.

Cost, output and payback in Fareham

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£526About 15 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£852About 11 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Fareham: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Fareham

  • Portchester
  • Wallington
  • Catisfield
  • Funtley
  • Titchfield
  • Titchfield Common
  • Stubbington
  • Hill Head
  • Locks Heath
  • Park Gate
  • Sarisbury
  • Swanwick
  • Warsash

Postcode districts: PO14, PO15, PO16, SO31

Solar panels in Fareham: your questions

Do I need planning permission for solar panels in Fareham?

Usually not. Roof panels on a house are permitted development within the national limits: no more than 0.2 metres off a pitched roof and no higher than its highest part. Listed buildings and some homes in the borough’s 13 conservation areas are the exceptions, and Fareham Borough Council asks to be contacted before work in a conservation area.

Which parts of Fareham are conservation areas?

Fareham Borough Council lists 13: Cams Hall, Catisfield, Fareham High Street, Hook, Osborn Road, Portchester (Castle Street), Sarisbury Green, Swanwick Shore, Titchfield, Titchfield Abbey, Town Quay, Wallington and Warsash. The council publishes a boundary plan for each, so you can check your address before planning anything.

Are Locks Heath, Warsash and Park Gate covered from Fareham?

Yes. The Western Wards are part of the borough of Fareham, so Fareham Borough Council is their planning authority, though their postcodes are in the SO31 district. Warsash and Sarisbury Green each have a conservation area; the council’s plans show where the boundaries run.

Who is the network operator for Fareham?

SSEN (Scottish and Southern Electricity Networks). A system of 3.68kW or less per phase is notified to SSEN under G98 within 28 days of commissioning. A larger system needs a G99 application before installation, so allow time for SSEN’s quotation.

Ready for solar in Fareham?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote

Your information is secure and will never be shared.