Solar Panels in Southampton

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 14 miles from Southampton in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Southampton

Your information is secure and will never be shared.

Solar in Southampton: the local details

Southampton has a mixed housing stock. At the 2021 Census, flats in purpose-built blocks were the largest single group at about a third of the city’s homes, followed by semi-detached houses at about a quarter, terraced houses at about a fifth and detached houses at about one in eight.

For a house, the questions at survey are the usual ones: which way the roof slopes face, how much clear space there is between chimneys, dormers and roof windows, and what shades it. Semi-detached and detached houses often have a side or rear slope as well as the front one, which gives more choice about where panels go.

For a flat, the national planning rules treat a block in much the same way as a house, but the roof normally belongs to the freeholder, so nothing can go on it without their agreement.

Southampton City Council

Southampton City Council is the planning authority for the city. Most houses can have panels on a pitched roof as permitted development, with no planning application, as long as the panels stand no more than 0.2 metres off the roof slope and no higher than the top of the roof. Panels on a flat roof can stand up to 0.6 metres above it.

Southampton’s conservation areas are the Old Town (North, South and West), Oxford Street, Canute Road, Carlton Crescent, Cranbury Place, The Avenue, Bassett Green Village, Ethelburt Avenue, Itchen Valley, Oakmount Triangle, Portswood Residents’ Gardens, St James Road, Uplands Estate, Old Woolston and St Anne’s Road. In any conservation area, panels on a wall facing a highway need planning permission and panels on a flat roof need the council’s prior approval.

Seven of those areas go further. The council has Article 4 directions in Oakmount Triangle, Portswood Residents’ Gardens, Uplands Estate, Ethelburt Avenue, The Avenue, Carlton Crescent and Cranbury Place, which remove householder permitted development rights there, including the right to alter a roof. Some cover the whole area and some only named streets. If your home is in one of them, or is listed, ask the council’s planning service whether panels need permission before you settle on a design. A listed building always needs listed building consent.

Scottish and Southern Electricity Networks (SSEN)

SSEN runs the local electricity network in Southampton. It has to be told about every solar system connected to it, and the route depends on the size of the system.

At 3.68kW or less per phase, the system comes under G98: it is installed, and your installer sends SSEN the G98 form within 28 days of commissioning. Above that and up to 50kW it comes under G99, which is an application made before any equipment is fitted. SSEN says a G99 quotation can take up to 45 working days once it has complete information, so a larger system needs that time allowed for.

Where SSEN finds the local network has too little spare capacity for the power a system would export, an export limitation scheme, which caps what the system sends to the grid, can be a quicker and cheaper route than paying for the network to be reinforced.

Cost, output and payback in Southampton

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£526About 15 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£852About 11 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Southampton: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Southampton

  • Shirley
  • Freemantle
  • Millbrook
  • Redbridge
  • Bassett
  • Highfield
  • Portswood
  • St Denys
  • Swaythling
  • Northam
  • Bitterne
  • Bitterne Park
  • Townhill Park
  • Harefield
  • Thornhill
  • Sholing
  • Woolston
  • Weston

Postcode districts: SO14, SO15, SO16, SO17, SO18, SO19

Solar panels in Southampton: your questions

Do I need planning permission for solar panels in Southampton?

For most houses, no. Panels on a pitched roof are permitted development if they stand no more than 0.2 metres off the slope and no higher than the top of the roof. The exceptions are listed buildings, some homes in conservation areas, and any property whose permitted development rights have been removed.

Which Southampton conservation areas have extra rules for solar?

Seven have Article 4 directions that remove householder permitted development rights, including the right to alter a roof: Oakmount Triangle, Portswood Residents’ Gardens, Uplands Estate, Ethelburt Avenue, The Avenue, Carlton Crescent and Cranbury Place. Whether that takes in solar panels on a particular house depends on the wording of the direction and the streets it covers, so ask Southampton City Council’s planning service about your address.

Is Hedge End part of Southampton for planning?

No. Hedge End has a Southampton postcode, SO30, but it is in the borough of Eastleigh, as are West End and Botley, so Eastleigh Borough Council is their planning authority. Our Eastleigh page has the local detail for them.

Who do I notify about connecting solar in Southampton?

SSEN (Scottish and Southern Electricity Networks) is the network operator, and your installer deals with it for you. A system of 3.68kW or less per phase is notified under G98 within 28 days of commissioning. A bigger one needs a G99 application before installation.

Can a flat in Southampton have solar panels?

About a third of Southampton homes are flats in purpose-built blocks. The permitted development rules cover a block of flats, with the same limits on how far panels may stand off the roof. The roof normally belongs to the freeholder, though, so the first step is their agreement.

Ready for solar in Southampton?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote

Your information is secure and will never be shared.