Solar Panels in Romsey

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 20 miles from Romsey in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Romsey

Your information is secure and will never be shared.

Solar in Romsey: the local details

Romsey’s town centre is a conservation area, so the oldest streets are the ones with the most planning limits. In the 2021 Census, terraced houses were the largest group of homes in the Romsey Abbey ward, with flats next, which means smaller roofs and, for a leaseholder in a flat, a need to ask the freeholder or management company first.

Further out the roofs get bigger. Terraced and detached houses are about a third each in Romsey Cupernham, semi-detached houses lead in Tadburn, and in the Chilworth, Nursling and Rownhams ward well over half of homes are detached. North Baddesley is mostly detached and semi-detached houses. A larger detached roof usually gives a choice of slopes, so the design can favour the one that faces closest to south and has the least shade.

Test Valley Borough Council

Test Valley Borough Council is the planning authority for Romsey and for North Baddesley, Ampfield, Chilworth, Nursling and Rownhams. The SO16 postcode district is shared with Southampton, so an SO16 address nearer the city may come under Southampton City Council instead.

Most houses need no planning application for roof panels. The national permitted development rules allow them on a pitched roof provided they do not sit above the highest part of the roof, chimney excluded, and do not project more than 200mm from the slope. A listed building, or a building in the grounds of one, is outside those rules, and work that alters a listed building needs listed building consent.

Test Valley has 36 conservation areas. Romsey’s was designated in 1970, extended in 1983 and reviewed in 2020, when the council redrew the boundary, so use the 2020 map to check an address. Ampfield and Chilworth each have a conservation area, both designated in 1989. Inside one, panels cannot go on a wall that fronts a highway, and panels on a flat roof need the council’s prior approval.

Scottish and Southern Electricity Networks (SSEN)

SSEN is the electricity network operator for Romsey and the villages on this page.

A solar system of up to 3.68kW per phase is connected under G98, which means the installer fits it and then sends SSEN the G98 form within 28 days of commissioning. A system above that size, up to 50kW, needs a G99 application to SSEN before installation, and SSEN says its quotation can take up to 45 working days once it has the right information.

Cost, output and payback in Romsey

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£526About 15 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£852About 11 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Romsey: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Romsey

  • North Baddesley
  • Ampfield
  • Chilworth
  • Nursling
  • Rownhams

Postcode districts: SO51, SO52, SO16

Solar panels in Romsey: your questions

Do I need planning permission for solar panels in Romsey?

Most houses do not. Roof panels that stay below the top of the roof and project no more than 200mm from the slope are normally permitted development. Listed buildings need consent, and the Romsey conservation area adds limits of its own, so check with Test Valley Borough Council if your home is in the town centre.

How do I know if my home is in the Romsey conservation area?

Test Valley Borough Council publishes the boundary on its conservation areas page. The boundary was reviewed in 2020 and changed, so an older map may be wrong for your street. If you are inside it, panels cannot be fitted to a wall that fronts a highway and a flat roof installation needs prior approval.

Are North Baddesley, Chilworth, Nursling and Rownhams covered by the same council?

Yes, all four are in Test Valley, along with Ampfield. Ampfield and Chilworth each have a conservation area. The network operator is SSEN throughout.

Who is the electricity network operator in Romsey?

Scottish and Southern Electricity Networks (SSEN). For a system of up to 3.68kW per phase the installer notifies SSEN within 28 days of commissioning, under G98. A larger system needs a G99 application before it is installed.