Solar Panels in Eastleigh

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 14 miles from Eastleigh in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Eastleigh

Your information is secure and will never be shared.

Solar in Eastleigh: the local details

Eastleigh grew up as a railway town. The council’s Local Plan describes a grid pattern of streets around the centre, with older buildings mostly from the Victorian and Edwardian eras. On a grid, a whole street tends to share the same two roof directions, so which side of the road you live on decides whether the sunnier slope is at the front or the back.

The Local Plan calls the borough predominantly suburban, with Chandler’s Ford and Hedge End as its other two large urban areas. Across the borough at the 2021 Census a third of homes were detached, a little over a quarter semi-detached, about a fifth terraced and about one in seven flats. A detached or semi-detached house usually offers more than one roof slope to choose from.

Eastleigh Borough Council

Eastleigh Borough Council is the planning authority for Eastleigh town, Chandler’s Ford, Bishopstoke, Fair Oak, Hedge End, West End, Botley, Bursledon, Hamble-le-Rice and Netley. Hedge End and West End have Southampton postcodes, but they are in this borough, not the city.

On most houses, roof panels are permitted development: no planning application, provided they stand no more than 0.2 metres off the roof slope and no higher than the top of the roof, or no more than 0.6 metres above a flat roof.

The borough has eight conservation areas: Bishopstoke, Botley, Old Bursledon, Bursledon Windmill, Gaters Mill and Romill Close, Orchards Way in West End, Hamble-le-Rice and Netley Abbey. The council’s Local Plan states that there are no conservation areas in Eastleigh town. Inside one, panels on a wall facing a highway need planning permission and panels on a flat roof need the council’s prior approval. A listed building needs listed building consent.

Scottish and Southern Electricity Networks (SSEN)

SSEN is the electricity network operator across the borough of Eastleigh. A solar system of 3.68kW or less per phase falls under G98, where the system is installed first and your installer then sends SSEN the G98 form within 28 days of commissioning.

A system above 3.68kW per phase, up to 50kW, falls under G99 and has to be applied for before it is installed. SSEN says it can take up to 45 working days to issue its quotation once it has the correct information.

After the commissioning paperwork is logged, SSEN sends an email confirming the system is compliant. Most suppliers want that email before they start paying an export tariff.

Cost, output and payback in Eastleigh

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£526About 15 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£852About 11 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Eastleigh: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Eastleigh

  • Chandler’s Ford
  • Boyatt Wood
  • Allbrook
  • Bishopstoke
  • Fair Oak
  • Horton Heath
  • Hedge End
  • West End
  • Botley
  • Bursledon
  • Hamble-le-Rice
  • Netley

Postcode districts: SO50, SO53, SO30, SO31

Solar panels in Eastleigh: your questions

Is Hedge End covered, and which council is it under?

Yes. Hedge End is in postcode district SO30, a Southampton postcode, but it is part of the borough of Eastleigh, and the council’s Local Plan treats it together with West End and Botley. Eastleigh Borough Council is the planning authority for all three.

Do I need planning permission for solar panels in Eastleigh or Chandler’s Ford?

For most houses, no. Roof panels are permitted development within the national limits of 0.2 metres off a pitched roof and no higher than its top. The borough’s eight conservation areas are in Bishopstoke, Botley, Bursledon, West End, Hamble-le-Rice and Netley, so none is in Eastleigh town or Chandler’s Ford, though a listed building or a home whose rights were removed by a planning condition would still need an application.

Which parts of the borough are conservation areas?

There are eight: Bishopstoke, Botley, Old Bursledon, Bursledon Windmill, Gaters Mill and Romill Close, Orchards Way in West End, Hamble-le-Rice and Netley Abbey. In those, panels on a wall facing a highway need planning permission and panels on a flat roof need prior approval. Check with Eastleigh Borough Council before fitting panels to a roof slope there, in case rights have been removed for your property.

Who is the network operator for Eastleigh?

SSEN (Scottish and Southern Electricity Networks). Your installer notifies it under G98 within 28 days of commissioning a system of 3.68kW or less per phase, or applies under G99 before installing a larger one.

Ready for solar in Eastleigh?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote

Your information is secure and will never be shared.