Solar Panels in Basingstoke
CRG Direct is an MCS certified solar panel installer based in Port Solent, about 29 miles from Basingstoke in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.
Get a free quote in Basingstoke
Your information is secure and will never be shared.
Solar in Basingstoke: the local details
Much of Basingstoke is post-war. The town was designated a London overspill town in 1961, and the council’s Local Plan records that it grew from a market town of about 16,000 people, with new residential areas at Oakridge, Popley and South Ham, then Brighton Hill, Chineham and Hatch Warren, and more recently Beggarwood and Rooksdown.
Across the borough at the 2021 Census the stock was evenly spread: about three in ten homes were detached, a little over a quarter terraced, about a quarter semi-detached and about one in seven flats. Whatever the type, the survey asks the same things of a roof: which slope faces the sun, how much clear space it has and what shades it. On a terrace the two slopes face opposite ways, so the direction of the street matters most.
The older part of town is different. Fairfields, South View and Brookvale West are Victorian and Edwardian streets, and they come with the tightest planning controls in Basingstoke.
Basingstoke and Deane Borough Council
Basingstoke and Deane Borough Council is the planning authority. For most houses, panels on a pitched roof are permitted development, so no planning application is needed, provided they stand no more than 0.2 metres off the roof slope and no higher than the top of the roof.
The borough has more than 40 conservation areas, which the council says is the largest number of any district in Hampshire. They range from built-up parts of central Basingstoke to rural villages. Within a conservation area the council says planning permission is needed for solar panels on a front or side wall of a house, or on the ground, where they would be visible from the street.
Four areas in the town also have Article 4 directions: Fairfields, South View, Brookvale West and Basingstoke Town Centre. The council lists the installation of any solar panels, including on the roof, among the work an Article 4 direction brings under planning control, generally where it can be seen from the street. If you live in one of those four, expect to need a planning application and talk to the council’s planning or conservation officers first. A listed building needs listed building consent wherever it is.
Scottish and Southern Electricity Networks (SSEN)
Basingstoke’s electricity network is run by SSEN, and every solar system connected to it is registered with SSEN under G98 or G99.
G98 applies at 3.68kW or less per phase and works by notification: the system is installed, then your installer sends SSEN the G98 form within 28 days of commissioning. SSEN wants an application before connection instead if there is more than one generator at the property or the total is above the G98 limit.
G99 applies above that, up to 50kW. It is an application made before installation, and SSEN advises getting in touch early, before any equipment is bought, because the network may need work and its quotation can take up to 45 working days.
Cost, output and payback in Basingstoke
| Package | System | Price | Output a year | Saving a year | Payback |
|---|---|---|---|---|---|
| Solar panels | 8 panels (3.6kW) | £7,673 | 3,094 kWh | £526 | About 15 years |
| Solar panels and a battery | 10 panels (4.6kW) with a 5.3kWh battery | £9,266 | 3,868 kWh | £852 | About 11 years |
Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Basingstoke: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.
- What solar panels cost to install
- Solar panel output by month
- How long solar panels take to pay for themselves
Not ready for a quote?
Get our free Solar Buyer's Report and read it in your own time.
Areas we cover in and around Basingstoke
- Chineham
- Popley
- Oakridge
- Winklebury
- Buckskin
- South Ham
- Kempshott
- Hatch Warren
- Beggarwood
- Brighton Hill
- Viables
- Kings Furlong
- Fairfields
- South View
- Eastrop
- Black Dam
- Rooksdown
- Old Basing
- Oakley
Postcode districts: RG21, RG22, RG23, RG24
Solar panels in Basingstoke: your questions
Do I need planning permission for solar panels in Basingstoke?
On most Basingstoke houses, no. Roof panels are permitted development if they stand no more than 0.2 metres off the slope and no higher than the top of the roof. Listed buildings, homes in conservation areas and homes under an Article 4 direction are the exceptions.
I live in Fairfields or South View. Can I still have solar?
You can apply, but you should expect to need planning permission. Fairfields, South View, Brookvale West and Basingstoke Town Centre have Article 4 directions, and the council lists the installation of any solar panels, including on the roof, among the work those directions control where it can be seen from the street. The council’s planning and conservation officers can tell you what is likely to be acceptable on your house.
Are the estates such as Popley, South Ham and Hatch Warren straightforward?
For planning, usually yes: they are houses outside the Victorian and Edwardian areas that carry Article 4 directions, so the ordinary permitted development limits apply unless a home’s rights were removed when it was built. Whether a particular roof is worth fitting comes down to which way it faces, its size and what shades it, which we look at in the free survey.
Who is the network operator for Basingstoke?
SSEN (Scottish and Southern Electricity Networks). A system of 3.68kW or less per phase is notified under G98 within 28 days of commissioning. A larger one needs a G99 application before it is installed, and SSEN’s quotation for that can take up to 45 working days.
Ready for solar in Basingstoke?
Send us your details for a free quote, see a price now with the calculator, or call us.
Your free quote
Your information is secure and will never be shared.