Solar Panels in Aldershot
CRG Direct is an MCS certified solar panel installer based in Port Solent, about 31 miles from Aldershot in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.
Get a free quote in Aldershot
Your information is secure and will never be shared.
Solar in Aldershot: the local details
Aldershot was a village until the army arrived in 1854, and it grew into a town within a generation. Rushmoor Borough Council notes that the Victorian street layout and many buildings of that period survive, including the officer housing built from the 1880s along new roads such as Cargate Avenue.
It is a town of smaller roofs. In the 2021 Census only about one home in six across Rushmoor was detached. Terraced and semi-detached houses make up roughly three quarters of homes in the Aldershot Park ward and two thirds in North Town, and flats are the largest group in Wellington and Manor Park. On a terrace or a semi the panel layout has to be fitted around chimneys, dormers and roof windows, and a leaseholder in a flat may need permission from the freeholder or management company.
The newest housing is at Wellesley, on former army land south of the Basingstoke Canal, where up to 3,850 homes have been under construction in phases since 2015.
Rushmoor Borough Council
Rushmoor Borough Council is the planning authority for Aldershot and North Camp. Ash, Ash Vale and Tongham are over the county boundary in Surrey, under Guildford Borough Council, and Badshot Lea is under Waverley Borough Council. Both Surrey councils are replaced by the new West Surrey Council on 1 April 2027.
Under the national permitted development rules most houses can have roof panels without a planning application. The panels must not sit above the highest part of the roof, the chimney aside, or project more than 200mm from the roof slope. Listed buildings are outside these rules and need listed building consent for work that alters them.
Rushmoor has nine conservation areas. Four are in Aldershot: Aldershot West, Cargate, Manor Park and Aldershot Military, and the Basingstoke Canal conservation area runs through the borough. In a conservation area panels cannot go on a wall that fronts a highway, and a flat roof installation needs the council’s prior approval. Rushmoor also has Article 4 directions in force, which remove some permitted development rights in the areas they cover, so check the council’s Article 4 page for your street.
Scottish and Southern Electricity Networks (SSEN)
SSEN operates the electricity network in Aldershot, and its area carries on across the Surrey border to Ash, Ash Vale, Tongham and Badshot Lea, so the same process applies on both sides.
A system of up to 3.68kW per phase is covered by G98: it is fitted first, and the installer sends SSEN the G98 form within 28 days of commissioning. A larger system, up to 50kW, needs a G99 application to SSEN before installation. SSEN says its quotation can take up to 45 working days from the date it has the right information.
Cost, output and payback in Aldershot
| Package | System | Price | Output a year | Saving a year | Payback |
|---|---|---|---|---|---|
| Solar panels | 8 panels (3.6kW) | £7,673 | 3,094 kWh | £526 | About 15 years |
| Solar panels and a battery | 10 panels (4.6kW) with a 5.3kWh battery | £9,266 | 3,868 kWh | £852 | About 11 years |
Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Aldershot: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.
- What solar panels cost to install
- Solar panel output by month
- How long solar panels take to pay for themselves
Not ready for a quote?
Get our free Solar Buyer's Report and read it in your own time.
Areas we cover in and around Aldershot
- North Camp
- Ash
- Ash Vale
- Tongham
- Badshot Lea
Postcode districts: GU11, GU12, GU10, GU9
Solar panels in Aldershot: your questions
Do I need planning permission for solar panels in Aldershot?
Most houses do not, because roof panels within the national limits are permitted development. Listed buildings need consent, and homes in the Aldershot West, Cargate, Manor Park or Aldershot Military conservation areas have extra limits. Rushmoor also has Article 4 directions in some areas, so it is worth checking your street with the council.
Can a terraced house in Aldershot have solar panels?
Yes. A terrace has a smaller roof than a detached house, so the system is sized to the slope that is available and to which way it faces. The roof, its covering and any shading are measured at the free survey before a design is drawn.
Which council covers Ash, Ash Vale and Tongham?
They are in Surrey, in Guildford borough, so Guildford Borough Council is the planning authority until 1 April 2027, when West Surrey Council takes over. Badshot Lea is in Waverley borough and moves to West Surrey Council on the same date. The electricity network operator is SSEN in all four, as it is in Aldershot.
Who do I tell about connecting solar panels to the grid in Aldershot?
Your installer deals with Scottish and Southern Electricity Networks (SSEN), the network operator. Up to 3.68kW per phase, SSEN is notified within 28 days of commissioning under G98. A larger system needs a G99 application before it is installed.
Ready for solar in Aldershot?
Send us your details for a free quote, see a price now with the calculator, or call us.
Your free quote
Your information is secure and will never be shared.