What to expect from a Guildford installation
1. On-site survey. Roof measurement, structural check, covering condition, shading assessment, consumer unit and earthing inspection, and a check on whether an Article 4 direction or conservation area designation applies to the property. On period stock we check the roof covering can take fixings before anything else gets discussed.
2. System modelling. We combine the survey measurements with satellite and aerial imagery to build an accurate array layout and a shading profile across the year. The imagery gets us the geometry. The site visit gets us everything imagery can't see: rafter condition, tile type, access, and the mature tree that's only a problem in December. Neither is sufficient on its own, which is why we won't quote from imagery alone.
3. Installation day. Scaffolding goes up first, usually the day before. The crew fits the mounting system, lays the panels, runs DC cabling to the inverter position, installs the inverter, isolators and any battery, and connects into the consumer unit. Most domestic installs are one to two days on site.
4. Commissioning and handover. Full electrical testing to BS 7671, generation verification, inverter configured to the correct DNO grid settings, MCS registration, and monitoring set up on your phone. You get the test certificates, the MCS certificate, DNO paperwork and a walkthrough before we leave.
Planning permission, conservation areas and grid connections
When you don't need planning permission. In most cases, roof-mounted solar on a house is permitted development, including within a conservation area, provided the panels project no more than 200mm beyond the roof plane, don't sit above the highest part of the roof, and aren't on a wall fronting a highway.
When you do.
- Article 4 directions. Guildford Borough Council uses Article 4 directions to control change in conservation areas. Where one applies, permitted development rights are removed and you need planning permission for work a neighbour two streets away could do freely. This is checkable in advance and we check it before quoting.
- Wall-mounted panels on a wall fronting and visible from a highway need permission.
- Ground-mounted arrays visible from a highway, and most standalone installations on Green Belt or designated land, need permission. Given how much of the borough is Green Belt, assume a ground-mount is an application.
- Listed buildings always need Listed Building Consent, wherever the panels go.
- Surrey Hills National Landscape. On the rural fringes of the borough, landscape and visual impact carry more weight and the bar for anything visible from open countryside is higher.
Listed Building Consent, briefly. It's a separate application from planning permission and it needs a heritage statement that engages properly with what makes the building significant. Consent is achievable. The approach that works is keeping panels off principal elevations, using rear or concealed slopes or a secondary building, and specifying all-black frames and rails rather than silver. Determination typically takes eight weeks or more, and pre-application advice is usually worth the fee on a sensitive property.
Grid connections, G98 and G99. Every system has to be notified to the DNO. In Guildford that is usually UK Power Networks, whose network covers parts of Surrey, not SSEN as it is on our Hampshire patch. We confirm the operator for your address before we apply. Different operator, different portal, different queue, and it's worth knowing which one you're in before anyone quotes you a timescale.
- G98 is a connect-and-notify route for small systems, up to 16A per phase, roughly 3.68 kW on a single-phase supply. Notification goes in after commissioning.
- G99 applies to anything larger, and to most solar-plus-battery combinations, because the battery's inverter output counts. This one is apply and wait. Approval must be in place before the system energises and it commonly takes four to eight weeks on a straightforward domestic job, longer where the local network is constrained.
We handle the paperwork. Planning applications, Listed Building Consent submissions, heritage statements, G98 notifications and G99 applications. You don't chase any of it.