Solar Panels in Gosport
CRG Direct is an MCS certified solar panel installer based in Port Solent, about 4 miles from Gosport in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.
Get a free quote in Gosport
Your information is secure and will never be shared.
Solar in Gosport: the local details
Gosport is a compact borough on a peninsula, and terraces are its commonest kind of home. At the 2021 Census terraced houses were the largest group at about 35% of homes, followed by semi-detached houses at just over a quarter and flats at about a fifth. Only about one home in eight was detached.
On a terraced or semi-detached house the roof is modest and has two main slopes, so the layout has to make the most of the one that faces the sun and work around chimneys and roof windows. With flats making up a fifth of the borough, it is also worth knowing that the national rules cover a block of flats, but the roof normally belongs to the freeholder and their agreement comes first.
Gosport Borough Council
Gosport Borough Council is the planning authority for the whole peninsula, including Alverstoke, Bridgemary, Rowner, Elson, Hardway and Lee-on-the-Solent. On most houses, roof panels are permitted development and need no planning application, provided they stand no more than 0.2 metres off the roof slope and no higher than the top of the roof.
Gosport has a long list of conservation areas for a small borough. They include Alverstoke, Anglesey, Lee-on-the-Solent, Hardway, Rowner, Stokes Bay, Stoke Road, Peel Road, Bury Road, Forton Road and the High Street, along with Royal Clarence Yard, Priddy’s Hard, Daedalus and Haslar. In a conservation area, panels on a wall facing a highway need planning permission and panels on a flat roof need the council’s prior approval.
A council can also remove permitted development rights from particular streets with an Article 4 direction. If your home is in a conservation area, ask Gosport Borough Council whether one applies to it before settling on a design. A listed building needs listed building consent.
Scottish and Southern Electricity Networks (SSEN)
SSEN owns and runs the electricity network in Gosport. Any solar system connected to it has to be registered with SSEN, under G98 for smaller systems and G99 for larger ones.
G98 covers 3.68kW or less per phase. The system is installed and your installer then sends SSEN the G98 form within 28 days of commissioning. An application before connection is needed instead where a property has more than one generator or the total would go over the G98 limit.
G99 covers anything above that up to 50kW, and is applied for before installation. SSEN says its quotation can take up to 45 working days once it has the correct information.
Cost, output and payback in Gosport
| Package | System | Price | Output a year | Saving a year | Payback |
|---|---|---|---|---|---|
| Solar panels | 8 panels (3.6kW) | £7,673 | 3,094 kWh | £526 | About 15 years |
| Solar panels and a battery | 10 panels (4.6kW) with a 5.3kWh battery | £9,266 | 3,868 kWh | £852 | About 11 years |
Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Gosport: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.
- What solar panels cost to install
- Solar panel output by month
- How long solar panels take to pay for themselves
Not ready for a quote?
Get our free Solar Buyer's Report and read it in your own time.
Areas we cover in and around Gosport
- Alverstoke
- Privett
- Forton
- Brockhurst
- Elson
- Hardway
- Bridgemary
- Rowner
- Lee-on-the-Solent
Postcode districts: PO12, PO13
Solar panels in Gosport: your questions
Do I need planning permission for solar panels in Gosport?
On most houses, no. Roof panels are permitted development if they stand no more than 0.2 metres off a pitched roof and no higher than its top. The exceptions are listed buildings, some homes in the borough’s conservation areas, and any property whose permitted development rights have been removed.
Are Alverstoke and Lee-on-the-Solent conservation areas?
Parts of both are. Alverstoke, neighbouring Anglesey and Lee-on-the-Solent each have a conservation area, and the council’s conservation pages show the boundaries. Inside one, panels on a wall facing a highway need planning permission and panels on a flat roof need prior approval, and the council may have removed further rights from particular streets, so ask before you plan.
Can a terraced house in Gosport take a useful solar system?
Terraces are the most common kind of home in Gosport, at about 35% of the borough. What a terraced roof can hold depends on which way its two slopes face, how much of the better slope is clear of chimneys and roof windows, and what shades it. Those are measured at the free survey before anything is quoted.
Who is the network operator for Gosport?
SSEN (Scottish and Southern Electricity Networks). A system of 3.68kW or less per phase is notified under G98 within 28 days of being commissioned. A larger system needs a G99 application to SSEN before installation.
Ready for solar in Gosport?