Solar Panels in the New Forest

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 21 miles from the New Forest in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in the New Forest

Your information is secure and will never be shared.

Solar in the New Forest: the local details

The New Forest is a district of detached homes: the 2021 Census recorded nearly half of all homes in the district as detached, and about six in ten in the Brockenhurst and Forest South East ward. The towns on the edge are built more tightly. In the Totton North ward, terraced houses are the largest group.

The National Park boundary does not follow the district boundary. Lyndhurst, Brockenhurst, Beaulieu, Sway, Burley and Ashurst are inside the Park. Totton, Hythe, Lymington, New Milton, Milford on Sea, Ringwood and Fordingbridge are outside it, although they are all in New Forest district.

New Forest National Park Authority and New Forest District Council

Properties inside the National Park boundary are dealt with by the New Forest National Park Authority, which is the planning authority for all areas within the Park. Properties outside it fall to New Forest District Council. It is worth checking your own address against the Park boundary, because a lot of people assume wrongly.

The Park has 20 conservation areas, three of which straddle the boundary with the district council’s area, and the Authority publishes the list. In a conservation area, panels cannot be fitted to a wall that fronts a highway, and the Authority notes that conservation areas can carry additional restrictions of their own.

One rule applies across the whole Park, not just its conservation areas: panels on a flat roof need an application to the planning authority for prior approval before any work starts.

Scottish and Southern Electricity Networks (SSEN)

SSEN runs the electricity network across the New Forest, inside the Park and outside it, from Totton and Hythe to Ringwood and Fordingbridge.

A system of up to 3.68kW per phase comes under G98: the installer fits it and sends SSEN the G98 form within 28 days of commissioning. Above that, and up to 50kW, the installer applies under G99 before the installation, and SSEN says its quotation can take up to 45 working days once it has the right information.

Site survey, planning and conservation areas

Two planning authorities cover the New Forest. Properties inside the National Park boundary are dealt with by the New Forest National Park Authority. Properties outside it fall to New Forest District Council. They are not the same body and they don't apply the same weight to visual impact. The first thing we establish at survey is which one you're in — a lot of people assume wrongly.

Roof suitability on period properties. Older roofs need checking before anything else: rafter condition and spacing, batten condition, and whether the covering can take fixings. Handmade clay tiles and natural slate are more brittle than modern concrete and need different hooks and more care. On some older roofs the honest answer is that the covering needs attention first, and we'd rather say that at survey than after we've taken half of it off.

Visual impact inside the National Park. The NPA's position is that small-scale renewables are supported where they're unobtrusive. In practice that means rear or side roof slopes, panels sitting flush and low-profile, all-black frames and rails rather than silver, and array shapes that follow the roof rather than fighting it. Getting the visual approach right at design stage is usually the difference between an approval and a refusal.

When do you need planning permission?

  • Most roof-mounted domestic solar is permitted development, including inside the National Park, provided panels project no more than 200mm from the roof plane and don't sit above the highest part of the roof.
  • Wall-mounted panels on a wall fronting a highway are not permitted development in a conservation area or a World Heritage Site.
  • Ground-mounted arrays have their own limits on size and siting, and can't sit forward of the principal elevation on designated land.
  • Listed buildings always require listed building consent, wherever the panels go. The Forest has a very high density of listed properties, so this catches more people than elsewhere.

We check all of it at survey and handle the applications with the relevant local authority. If a pre-application enquiry to the NPA is the sensible route, we'll say so.

Solar installations for rural, period and commercial properties

Thatch. You cannot roof-mount solar panels on thatch. Fixings can't be made safely, the fire risk is real, and no reputable installer will attempt it. That doesn't mean thatched properties are excluded — the array goes on an outbuilding, barn, garage or cart shed, or onto a ground-mount screened from view. Thatched properties are often listed as well, so consent will be needed for the alternative siting.

Slate and handmade tile. Natural slate needs slate hooks rather than standard roof hooks, and a slater's approach to lifting and re-dressing. Handmade clay peg tiles need careful hook selection and slower work. Both are entirely doable — they just aren't a job for a crew working to a two-hours-per-roof schedule.

Rural properties and larger roof areas. Barns, stables, machinery sheds and agricultural buildings frequently give you far more usable roof than the house does, often with better orientation and no shading. Where the buildings are on the same supply, a larger array on the barn feeding the house is usually the better engineering answer. Rural New Forest properties are also more likely to be off the gas grid and running on oil or electric heating, which means higher electricity demand and a stronger case for both solar and a heat pump.

Commercial. Larger commercial solar installations for New Forest businesses — nurseries, farm shops, holiday parks, light industrial units around Totton, Ringwood and Fordingbridge. These need a structural survey before anything else, and a half-hourly consumption analysis to establish self-consumption, which is what actually drives the return. Larger schemes inside the National Park face a higher bar on visual impact; the NPA has refused large ground-mounted solar farms in the Park and is explicit that the need for renewable energy doesn't override landscape protection.

Listed buildings. The approach that gets consent is minimising visual impact: rear slopes, secondary buildings, all-black hardware, no panels on principal elevations, and a heritage statement that engages properly with the significance of the building rather than treating it as a formality.

Cost, output and payback in the New Forest

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£526About 15 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£852About 11 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for the New Forest: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around the New Forest

  • Lyndhurst
  • Brockenhurst
  • Totton
  • Hythe
  • Lymington
  • Ringwood
  • Fordingbridge
  • New Milton
  • Sway
  • Milford on Sea
  • Beaulieu

Postcode districts: SO40, SO41, SO42, SO43, SO45, BH24, BH25, SP6

Solar panels in the New Forest: your questions

Is my town inside the New Forest National Park?

Lyndhurst, Brockenhurst, Beaulieu, Sway, Burley and Ashurst are inside the Park. Totton, Hythe, Lymington, New Milton, Milford on Sea, Ringwood and Fordingbridge are outside it. A home on the edge of any of these should be checked against the Park boundary map.

Does a flat roof need permission for solar panels in the National Park?

It needs a step that a pitched roof does not. On a flat roof inside the Park, or in any conservation area, you must apply to the planning authority first to find out whether its prior approval is required. Panels on a pitched house roof that meet the national limits do not need that step.

Who is the electricity network operator in the New Forest?

Scottish and Southern Electricity Networks (SSEN), for the whole district. The installer notifies SSEN within 28 days of commissioning a system of up to 3.68kW per phase, under G98. A larger system needs a G99 application to SSEN before it is installed.