Solar Panels in Leeds

CRG Direct is an MCS certified solar panel installer based in Port Solent, Portsmouth, covering Leeds. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Leeds

Your information is secure and will never be shared.

Solar in Leeds: the local details

Leeds has more semi-detached homes than anything else, 37.5% at the 2021 Census, followed by terraces at 25.0% and purpose-built flats at 17.5%. It also has a house type few other cities kept: Leeds City Council’s housing strategy counts 19,500 back-to-back houses built before 1919 that are still lived in.

A back-to-back shares its rear wall with the house behind it, so it generally sits under one roof slope where an ordinary terrace has two. Which way the street faces therefore decides whether the roof suits panels at all. Elsewhere, the council’s conservation area appraisals describe red brick terraces with slate roofs and regular rows of chimneys in Chapel Allerton, and stone villas with slate roofs on Headingley Hill. Slate and chimneys both affect how panels are fixed and where they fit.

Leeds City Council

Leeds City Council is the planning authority for the whole Leeds district, which takes in Horsforth as well as the city’s own suburbs. On most houses, panels on a pitched roof are permitted development and need no planning application, provided they stand no more than 0.2 metres off the roof slope and no higher than the highest part of the roof.

The council has 80 conservation areas. Those on this side of the city include Headingley, Far Headingley, Headingley Hill, Hyde Park and Woodhouse Moor, Roundhay, Chapel Allerton, Horsforth, Horsforth Cragg Hill, Newlay and Kirkstall Abbey. The council says permitted development rights are restricted in a conservation area and lists “some solar panels” among the works that then need planning permission. Under the national rules that includes panels on a wall facing a highway, and panels on a flat roof need the council’s prior approval. A listed building needs listed building consent. If your home is in a conservation area, ask the council before settling on a layout.

Northern Powergrid

The local electricity network in Leeds is run by Northern Powergrid, which covers the North East, Yorkshire and north Lincolnshire. It is a separate company from your electricity supplier. Every solar system that connects to the grid is registered with the network operator under one of two national engineering standards, G98 or G99.

G98 covers systems of up to 16 amps per phase, which is 3.68kW on the single-phase supply most homes have. The system is fitted first, and the installer must send the operator the details no later than 28 days after commissioning it. A system above that limit comes under G99, and the operator has to be consulted before it is installed. Northern Powergrid publishes its own forms for both.

Cost, output and payback in Leeds

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£526About 15 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£852About 11 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Leeds: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Leeds

  • Headingley
  • Roundhay
  • Chapel Allerton
  • Horsforth
  • Moortown
  • Kirkstall

Postcode districts: LS1, LS4, LS5, LS6, LS7, LS8, LS16, LS17, LS18

Solar panels in Leeds: your questions

Can a back-to-back house in Leeds have solar panels?

It depends on which way it faces. A back-to-back generally has a single roof slope, so there is no second side to fall back on if that slope faces north. Leeds still has about 19,500 of these houses, and a survey of the roof is the only way to know whether yours has the space and the direction for panels.

Do I need planning permission for solar panels in Headingley or Roundhay?

Outside a conservation area, usually not, as long as the panels stay within the national size limits. Headingley, Far Headingley, Roundhay and Chapel Allerton all have conservation areas, and Leeds City Council says some solar panels need planning permission in one. Check the council’s conservation area maps for your street and ask its planning service if you are inside a boundary.

Who is the electricity network operator for Leeds?

Northern Powergrid, which runs the network across Yorkshire and the North East. A system of 3.68kW or less on a single-phase supply is notified to it under G98 within 28 days of being commissioned. A larger system comes under G99, and the operator has to be consulted before it is installed.

Ready for solar in Leeds?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote

Your information is secure and will never be shared.