Solar Panels in Newcastle upon Tyne

CRG Direct is an MCS certified solar panel installer based in Port Solent, Portsmouth, covering Newcastle upon Tyne. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Newcastle upon Tyne

Your information is secure and will never be shared.

Solar in Newcastle upon Tyne: the local details

Newcastle has a house type of its own, the Tyneside flat. From the street it looks like a terraced house, but it is two flats, one above the other, each with its own front door side by side. The regional historic landscape study held by the city council records the same design applied to semi-detached houses in Heaton, and notes that upper flats sometimes used the attic for extra bedrooms.

That matters for solar because two households sit under one roof. Before anything else, find out from your lease or title who owns the roof and whose agreement is needed. Across the city at the 2021 Census, 34.6% of homes were semi-detached, 24.8% were in purpose-built blocks of flats and 23.6% were terraced. In Gosforth the council’s character statement describes mostly late 19th and early 20th century housing with roofs of slate and red clay tile, some of them pantiles, and each of those is fixed to differently.

Newcastle City Council

Newcastle City Council is the planning authority for Newcastle upon Tyne. On most houses, panels on a pitched roof are permitted development and need no planning application, provided they stand no more than 0.2 metres off the roof slope and no higher than the highest part of the roof. The same national rules cover a block of flats.

The council has 12 conservation areas. The ones in the residential suburbs are Gosforth, South Jesmond, Jesmond Dene and Brandling Village; the others include Central, Leazes, Summerhill and Lower Ouseburn Valley. In a conservation area, panels may not go on a wall that faces a highway without planning permission, and panels on a flat roof need the council’s prior approval. The council also publishes a list of Article 4 directions, which remove further rights on named streets, so check it for your address. A listed building needs listed building consent, and much of the Byker Estate is listed.

Northern Powergrid

The local electricity network in Newcastle is run by Northern Powergrid, the operator for North Eastern England. It is a separate company from your electricity supplier. Every solar system that connects to the grid is registered with the network operator under one of two national engineering standards, G98 or G99.

G98 covers systems of up to 16 amps per phase, which is 3.68kW on the single-phase supply most homes have. The system is fitted first, and the installer must send the operator the details no later than 28 days after commissioning it. A system above that limit comes under G99, and the operator has to be consulted before it is installed. Northern Powergrid publishes its own forms for both.

Cost, output and payback in Newcastle upon Tyne

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£526About 15 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£852About 11 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Newcastle upon Tyne: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 35% of what its panels generate, or 70% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Newcastle upon Tyne

  • Gosforth
  • Jesmond
  • Heaton
  • Byker
  • Fenham
  • Kenton

Postcode districts: NE1, NE2, NE3, NE4, NE6, NE7

Solar panels in Newcastle upon Tyne: your questions

Can a Tyneside flat have solar panels?

The planning rules do not rule it out, because permitted development covers a block of flats as well as a house. The harder question is the roof, which sits over two homes. Check your lease or title to see who owns it, and expect to need the agreement of the other flat’s owner or the freeholder before any panels go up.

Do I need planning permission for solar panels in Gosforth or Jesmond?

Often not, but check first. Gosforth, South Jesmond, Jesmond Dene and Brandling Village are conservation areas, where panels on a wall facing a highway need planning permission and panels on a flat roof need the council’s prior approval. Newcastle City Council also keeps a list of Article 4 directions for particular streets, so look up your address or ask its planning service.

I live on the Byker Estate. Can I have solar?

Much of the Byker Estate is listed, some of it at Grade II*. Permitted development does not apply to a listed building, so panels there would need planning permission and listed building consent from Newcastle City Council. Speak to the council before going any further.

Who is the electricity network operator for Newcastle?

Northern Powergrid. A system of 3.68kW or less on a single-phase supply is notified to it under G98 within 28 days of being commissioned. A larger system comes under G99, and the operator has to be consulted before it is installed.

Ready for solar in Newcastle upon Tyne?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote